Ironwood Grounds
Premium decks — South Surrey, White Rock & Delta

Composite, raised & covered decks — booking for spring 2027.

The bigger deck projects: composite decking, decks well off the ground, glass railings and roofs over the deck. Booking for spring 2027 — join the waitlist and we'll contact you when booking opens.

  • Composite decking
  • Raised & elevated
  • Glass railings
  • Covered decks
Booking for spring 2027 Join the waitlist — no obligation South Surrey · White Rock · Delta No obligation — joining the waitlist is free
What the crews build

Four kinds of deck, one call to start.

These are the projects that go beyond a simple cedar deck at ground level. Each one is quoted, contracted and built by a crew that does that kind of work.

01

Composite decks

Composite boards in place of wood on the walking surface, for owners who would rather not stain and seal every few seasons. Usually on a new pressure-treated frame; sometimes on an existing frame, if it checks out as sound.

  • New composite deck on a new frame
  • Re-decking an old deck in composite
  • Board colour, border and fastener options set out in the quote
02

Raised & elevated decks

Decks off a main floor or walk-out level that sit well above the yard. Height changes everything: footings, posts, beams, stairs and a guard on every open side — and, in practice, a building permit.

  • Off-the-kitchen and walk-out decks
  • Full stair runs down to the yard
  • Replacing an old raised deck, frame and all
03

Glass railings

Glass panel railings keep the view open — on the Peninsula that often means the water or the yard. The railing is also the deck's guard, so it is planned with the frame, not added at the end.

  • Glass panel railings on new decks
  • Replacing tired wood or picket railings
  • Glass, aluminium picket or wood, compared in the quote
04

Covered decks

A roof or cover over the deck so it gets used through the wet months. A roof adds posts, beams and loads to the design, and covering a deck brings its own permit question — so it is scoped up front.

  • Solid roofs tied into the house
  • Freestanding covers over the deck
  • Planned together with the deck below
How Ironwood works

Booking for spring 2027 — join the waitlist.

A raised or covered deck involves design, a permit, framing, decking, railings and inspections. The hard part is finding a crew that does that kind of deck well. Booking for spring 2027 — join the waitlist.

Before you hire anyone, ask for current WorkSafeBC coverage, liability insurance, a business licence and a fixed written quote.

You

1. Tell us the job

Call or use the form. How you want to use the deck, the look you are after and roughly what you want to spend.

Ironwood

2. We contact you when booking opens

Booking opens in spring 2027. We will contact you then — joining the waitlist is free and commits you to nothing.

Crew

3. The crew quotes and contracts with you directly

A fixed written quote, then the permit, inspections and build, all with the crew.

Permits & inspections

Above 600 mm, plan on a permit.

A simple deck close to the ground is the case where a permit is least likely. A raised deck is the opposite. Here is what each city's own pages say — summarized from our deck permit guide for Surrey, White Rock and Delta, which links every source.

Surrey

Over 600 mm is regulated

Surrey's Building Bylaw lists decks more than 600 mm above finished grade among the structures it regulates, and the City says a building permit is needed in most cases when a deck is added to a house. Its deck applications are also reviewed by the City's trees team.

White Rock

Covering a deck counts too

White Rock lists constructing, covering or enclosing a porch or sundeck as work that needs a building permit, and states no height below which a deck is exempt. That matters for a covered deck as much as a raised one.

Delta

Its own sundeck permit

Delta has a dedicated permit for sundeck additions, applied for online through DeltaOnline. Its checklist asks for setbacks, railing construction and height, stair rise and run, and footing sizes and depth.

600 mm

Separately from permits, the BC Building Code calls for a guard where a walking surface is more than 600 mm (about 24 in) above the surface beside it — so a raised deck needs a railing on every open side. When a permit is needed, the crew handles the drawings, the application and the inspections — our guide explains the rules. Details and sources: deck permit rules for Surrey, White Rock and Delta.

What drives the price

What a premium deck costs depends on these.

Every one of these decks is quoted on site by the crew, because the numbers move with the house and the yard. These are the things that move them — and each one is itemized in the crew's fixed written quote.

  1. SizeSquare footage of the deck surface, and its shape — corners, angles and levels add framing and cuts.
  2. HeightHigher decks need deeper footings, taller posts, bigger beams, a full stair run and a guard on every open side.
  3. Decking materialComposite boards, or cedar. Within composite, the product line, colour and border detail all change the number.
  4. Railing typeGlass panels, aluminium pickets or wood — and how many linear feet of guard the deck needs.
  5. Roof or coverWhether the deck is covered, how the cover ties into the house, and the extra posts and beams it needs.
  6. Permits & drawingsCity permit fees and any drawings the application calls for, plus inspection visits.
  7. Old deck removalTearing out an existing deck and hauling it away, and anything found underneath once it is open.
  8. Site accessHow materials and equipment reach the back yard, slope, and how much room the crew has to work.
Composite or cedar?

The honest trade-off.

Both are good deck floors in our wet climate. The choice is mostly upkeep against upfront cost and the look you want.

CompositeWestern red cedar
UpkeepCleaning, no staining or sealing.Sealing every couple of seasons keeps its colour and helps the boards last.
Upfront costUsually higher for the boards themselves.Usually lower for the boards.
LookEven colour from a manufacturer's range; does not grey the way wood does.Real wood grain and warmth; weathers to silver if left unsealed.
UnderneathStill a wood frame — usually pressure-treated lumber, which is what decides how long the deck lasts.Same: a pressure-treated frame doing the structural work.

Prefer a simple wood deck close to the ground? See simple cedar decks. Keeping an existing deck looking good? See fence and deck staining.

Start to finish

Four steps, one fixed quote.

You know the scope, the materials, the permit plan and the working timeline before anything is ordered.

01

Tell us the job

Call or use the form. Tell us about the space, the height at your door, and the materials, railing and any cover you have in mind.

02

We contact you when booking opens

Booking opens in spring 2027. We will contact you then — joining the waitlist is free and commits you to nothing.

03

Fixed written quote

The crew measures and gives you one itemized quote and a working timeline, with the permit question answered. You contract with the crew directly.

04

Permit, build & cleanup

The crew handles any permit and inspections and builds the frame, decking, railings and any cover.

Where we work

The Peninsula, and only the Peninsula.

Ironwood Grounds takes spring 2027 waitlist requests across South Surrey, White Rock, Ocean Park, Morgan Creek, Tsawwassen, Ladner and the wider Delta area.

Questions, answered

The details, before you ask.

Do I need a permit for a raised deck in Surrey, White Rock or Delta?

Plan on it. Surrey's Building Bylaw lists decks more than 600 millimetres above finished grade among the structures it regulates, and the City says a building permit is needed in most cases when a deck is added to a house. White Rock lists constructing, covering or enclosing a porch or sundeck as work that needs a permit, and Delta runs its own sundeck permit application. When a permit is needed, the crew that takes on the job handles the drawings, the application and the inspections.

Who actually builds my deck?

A local crew that specializes in the kind of deck you want visits, gives you a fixed written quote, contracts with you directly, handles any permit and inspections, and builds the deck. Booking for spring 2027 — join the waitlist.

Do you build composite decks in South Surrey and White Rock?

Yes — across South Surrey, White Rock, Ocean Park, Morgan Creek, Tsawwassen, Ladner and the rest of Delta. Booking for spring 2027 — join the waitlist. Projects run from a new composite floor on a fresh frame to replacing tired boards where the frame underneath is still sound enough to keep.

Does a raised deck need a railing?

Yes, in most cases. The BC Building Code calls for a guard where a walking surface is more than 600 millimetres above the surface beside it. Glass, aluminium picket and wood railings can all serve as that guard; which one suits your deck depends on the view, the budget and the design of the house.

What affects the cost of a composite or raised deck?

Mostly size and height: a deck well off the ground needs deeper footings, posts and beams, and a guard on every open side. After that come the decking material, the railing type, any roof or cover, stairs, permit drawings and fees, removing an old deck, and how easy the site is to reach. The crew's fixed written quote itemizes each of these.

Can you put a roof over my deck?

Yes — a crew that does this work can. A covered deck, from a solid roof tied into the house to a freestanding cover over the deck, can be part of the project. Covering a deck is permit work in White Rock, and a roof adds structure and loads to plan for elsewhere, so the crew sorts out the permit question before anything is ordered.

Join the waitlist

Join the spring 2027 waitlist.

Tell us about the deck you have in mind. We'll add you to the spring 2027 waitlist and contact you when booking opens.

  • Booking for spring 2027
  • We contact you when booking opens
  • Joining the waitlist is free
(778) 850-1016

Your details may be shared with the local contractor who takes over the work.

No spam, no obligation. We will contact you when spring 2027 booking opens.

Call now Join the waitlist