Exposed Aggregate
After the pour, the top layer of cement paste is washed away so the stones in the mix show at the surface. It gives a textured, grippy finish that hides dirt and tire marks, and the look depends on the stone you pick.
Exposed aggregate, stamped, broom-finish and coloured concrete for driveways, walks, patios and steps. Booking for spring 2027 — join the waitlist and we'll contact you when booking opens.
The finish is what you see from the street. It is chosen for looks, grip and upkeep, but every one of them sits on the same groundwork: a compacted base, a slope that sheds water and joints in the right places. The crew that takes on the job shows you samples and scopes it at a site visit.
After the pour, the top layer of cement paste is washed away so the stones in the mix show at the surface. It gives a textured, grippy finish that hides dirt and tire marks, and the look depends on the stone you pick.
Pattern mats are pressed into the fresh concrete to give the look of stone, slate or brick, usually with colour worked in. It suits patios, walks and feature borders where you want a pattern without individual units. Stamped surfaces are normally sealed, and the crew should explain the upkeep before you choose it.
The plain, practical finish: a broom dragged across the surface leaves fine ridges that give grip in the rain. It is the simplest of the four, works well for side yards, pads and utility areas, and is easy to keep clean.
Colour can be mixed through the whole batch or worked into the surface, and it pairs with stamped, broom or smooth finishes. It is a way to warm up grey concrete or match the house and existing hardscape. Ask to see a cured sample, since wet and dry colour look different.
Most concrete jobs start with the driveway and end up taking in the walk to the door, the front steps or a pad round the side. Tell us the whole job in one call.
Tearing out a cracked, sunken or stained old driveway and pouring a new one, or widening and reshaping an existing one. Tear-out and hauling away the old concrete or asphalt is real work and belongs in the quote, not as a surprise afterwards.
Where the driveway meets the street, the letdown and the boulevard usually belong to the city. That part of the job typically needs municipal approval, which the crew handles. See permits below.
Front walks, side paths and poured steps up to the door. Steps need even risers and a finish with grip in the rain, and they are a good place to match the driveway finish so the front of the house reads as one piece.
Poured patios in exposed aggregate, stamped or broom finish. If you are weighing concrete against pavers for a patio, our paver patios page covers the paver side.
Pads for a shed, hot tub, garbage and recycling bins, a heat pump, or extra parking at the side of the house. A pad that will carry real weight needs its base and thickness set for the load, and the crew should ask what is going on it.
Driveways on the coast rarely fail at the surface. They crack and sink because the ground under them was soft, the water had nowhere to go, or the joints were in the wrong place. That is why base prep, slope and reinforcement deserve as much space in a quote as the finish.
Concrete keeps gaining strength well after the pour, and weather affects how quickly it gets there. Foot traffic comes first, cars later. The crew tells you when the slab is ready to walk on and when it is ready to drive on. Follow their timing, not the neighbour's.
Exposed aggregate and stamped finishes are usually sealed to help with stains, moss and the wet winters, and sealers wear and need redoing over time. Ask the crew which sealer they use, when it goes on, and what upkeep it needs afterwards.
Water pooling on the old driveway or running toward the garage? Drainage is often part of the same job — see our French drains and yard drainage page. A driveway cut into a slope may need a retaining wall beside it.
Booking for spring 2027 — join the waitlist. The crew quotes, contracts, takes payment, pulls permits, gives any warranty and does the work in its own name.
Call or send the form: what you want poured, roughly how big, and what is there now.
Booking opens in spring 2027. We will contact you then — joining the waitlist is free and commits you to nothing.
The crew looks at the area, the old surface, the slope, where water goes and how a truck gets in, then gives you a written quote with tear-out, base, finish and permits written in.
Read the quote and ask questions before you sign. You contract with the crew directly.
Tear-out, base prep, forms, reinforcement, the pour and the finish, plus any city permits for the curb and boulevard, all in the crew's own name.
Walk the job with the crew before the final payment. If something went wrong, raise it with the crew in writing.
No two driveways cost the same, which is why crews quote after a site visit rather than by the square foot over the phone. These are the things that move the number.
The part of a driveway that crosses the boulevard and meets the street, the letdown or curb cut, is usually city property, so a new driveway or work in the boulevard usually needs municipal approval. In Surrey, the City says residential owners who want to construct a new driveway must apply for a driveway permit, each single-family or duplex lot is permitted one driveway, and working on the City's road allowance needs a City Road & Right-of-Way Use Permit and a Traffic Obstruction Permit.
Delta requires a Highway Use Permit for any work within the road dedication, including driveway construction and boulevard alterations. In White Rock, check with the city. Whatever your address, the crew pulls the permits your job needs before the work starts.
Sources: City of Surrey, Driveway permit; City of Delta, Highway Use Permit. Rules change — the city's current requirements govern, and the crew confirms them for your address.
Both make a good driveway on a good base. The choice comes down to the look you want, how you feel about repairs later, and the budget.
One continuous slab with fewer joints and a clean, solid look. Exposed aggregate and stamped finishes give it texture and pattern without individual units.
Concrete will develop some cracks over time, which is what control joints are for. A crack or a patch is harder to repair invisibly, because new concrete rarely matches old exactly.
Individual units laid on a compacted base, with joints between them that allow small movements. If a section settles, or a pipe underneath needs work, it can be lifted and relaid.
Pavers bring more pattern and colour choice, and joints that need some upkeep. See paver patios & walkways for how a paver job is built.
A new driveway often brings a new walk, a wall where the yard is cut into a slope, or drainage where water used to sit. Tell us about the whole front or back yard when you join the spring 2027 waitlist.
Ironwood Grounds takes spring 2027 waitlist requests across the Peninsula — South Surrey, White Rock, Ocean Park, Morgan Creek, Tsawwassen, Ladner and the wider Delta area.
It is a concrete driveway where the thin layer of cement paste on top is washed or brushed away after the pour, so the stones mixed into the concrete show at the surface. The result has texture and grip, and hides dirt and tire marks better than a smooth finish. The look depends on the stone in the mix, so ask the crew to show you samples or a past job before you choose.
Often, yes, and especially where the work reaches the curb or the city boulevard. The City of Surrey says residential owners who want to construct a new driveway must apply for a driveway permit, and that working on the City's road allowance needs a City Road and Right-of-Way Use Permit and a Traffic Obstruction Permit. Delta requires a Highway Use Permit for any work within the road dedication, including driveway construction and boulevard alterations. In White Rock, check with the city. The crew pulls whatever permits your job needs.
Both make a good driveway on a good base. Concrete is one continuous slab with fewer joints and a clean look, and exposed aggregate or stamped finishes give it texture. Pavers are individual units, so a section can be lifted and relaid if it settles or a pipe underneath needs work, where a crack in concrete is harder to repair invisibly. The right answer depends on the look you want, the site and the budget, and the crew talks it through with you.
The size of the area, tearing out and hauling away the old driveway, how much digging and base preparation the ground needs, the finish (broom, exposed aggregate, stamped or coloured), the reinforcement, how easily a concrete truck can reach the pour, any drainage or slope correction, steps and borders, sealing, and the permits and boulevard work. The crew prices it in a written quote after a site visit.
Concrete shrinks as it cures and moves with temperature, so some cracking is normal. Control joints are cut or tooled into the slab so that cracking happens along straight lines where you expect it. Random or wide cracks usually trace back to a soft or poorly compacted base, water running under the slab, joints that are too far apart, or heavy loads on a slab that was not built for them. That is why the base, drainage and joint layout matter as much as the finish.
Not right away. Concrete keeps gaining strength for some time after it is poured, and weather affects how fast it cures. Foot traffic comes first and cars later. The crew tells you when the new slab is ready to walk on and when it is ready to drive on, and you should follow their timing.
A local concrete crew. Booking for spring 2027 — join the waitlist. The crew quotes, contracts with you, takes payment, pulls permits, gives any warranty and does the work in its own name.
Raise it with the crew in writing. The crew is responsible for its own work and any warranty it gives.
Tell us what you want poured, roughly how big, and what is there now. We'll add you to the spring 2027 waitlist and contact you when booking opens.